Site map Home Ringing at All Saints All Saints Ringers All Saints Tower Bell restoration Project Visiting All Saints Learning to Ring About Bellringing History of Ringing Articles Links Diary Contact us

Installing the screen (summer 2016)

lFrameTimber/jpg 
Timber for making the main frame to support the glass

 lScaffoldingNave/jpg
Scaffolding seen from the nave

 lScaffoldingGallery/jpg
Scaffolding seen from inside the ringing gallery

 lScaffoldingFont/jpg
The scaffolding wasn't too intrusive at ground level

 lCraneArrive/jpg
The spider crane arriving - folded up

 
lGlassTopCarry/jpg

 Carrying in the first piece of glass

 lTopLiftUp/jpg
The top piece of glass being lifted

 lTopLiftThrough/jpg
Glass being manoeuvred through the arch

lSamTopWait1/jpg 
Lifting the glass seen from above

lTopIn/jpg 
The top piece in place

lTopFitting/jpg 
Guiding the glass onto the fixing studs

lMidReadyCrane/jpg 
The second piece of glass ready to lift

lMidLiftIn/jpg 
Guiding the middle piece of glass through the arch

lCraneLookUp/jpg 
The crane driver's view

lCurtainsS/jpg 
One of the new acoustic drapes


The base unit installed


Back to top Back to picture index Feedback